OCF Collab Network:ocfcWork: Difference between revisions

From T3 Network Wiki
mNo edit summary
Line 13: Line 13:
'''Project Period:''' December 17, 2021 through May 31, 2022
'''Project Period:''' December 17, 2021 through May 31, 2022


= ''OCFC:PP-002:'' Decentralize the Metamodel Interchanger (Draft) =
= ''OCFC:PP-00X:'' Decentralize the Metamodel Interchanger (Draft) =


[https://docs.google.com/document/d/11exvepHX7IELcOJ3K8hXeaRidLtFT8BduFkmzMtKPtI/edit?usp=sharing '''Draft OCFC:PP-002 Working Document''']
[https://docs.google.com/document/d/11exvepHX7IELcOJ3K8hXeaRidLtFT8BduFkmzMtKPtI/edit?usp=sharing '''Draft OCFC:PP-00X Working Document''']


'''Project Description:''' [TBD]
'''Project Description:''' [TBD]

Revision as of 18:10, 30 January 2022

>> OCFCollab Home >> Project Plans

Projectplans.png

All of the work of this network must be rooted in Use Cases that advance the objectives of one or more well-define Project Plans in service of the missions of the Network and the T3N2.

OCFC:PP-001: Develop DESM Project Configuration Dashboard

OCFC:PP-001 Working Document (Approved and Funded)

Project Description: This project plan defines work to be done in implementing a configuration dashboard for the Data Ecosystem Mapper (DESM) tool to facilitate the setup of the configuration profile by schema mapping leads. The plan and document including wireframes for configuring the Tool for a particular mapping project was developed as part of the work of OCF Collab Phase 2 in 2020.

Project Period: December 17, 2021 through May 31, 2022

OCFC:PP-00X: Decentralize the Metamodel Interchanger (Draft)

Draft OCFC:PP-00X Working Document

Project Description: [TBD]